Solar PV company fined for health and safety failure
A solar PV company has been fined £120,000 after an employee broke his leg while working on a property in Salisbury.
The man, who was 23 at the time, fell from the roof of the house on 16 December 2022. He had been adjusting a solar panel when he slid and fell four metres onto the ground below, sustaining a broken femur as a result.
A Health and Safety Executive (HSE) investigation found the organisation, which offers solar power solutions, had not properly planned the work at height and failed to take suitable steps to prevent a fall. The company had been hired by the homeowner to move nine solar panels higher up on the roof. The company was fined £120,000 and ordered to pay £4,716 in costs at Swindon Magistrates’ Court on 23 December 2024.
HSE inspector Sam Applebee said: “EE Renewables Limited did not properly plan this work so it could be carried out in a safe manner. There were inadequate means of protecting the workers from falling off the roof, with the company failing to provide edge protection. Working at height remains one of the biggest causes of injuries and fatalities in Britain, so it is important that companies ensure they implement the correct control measures and safe working practices.”
This prosecution was brought by HSE enforcement lawyer Karen Park and supported by HSE paralegal officer Rebecca Withell.
ECA offers support to Members who may carry out work at height. Resources to help manage safe work at height are on their website here.
Members are also able to take advantage of discount with Nationwide Platforms for hire of work at height equipment and training.
HSE guidance can be found at: Work at height – HSE
This article appears on the ECA news and blog site as 'Solar PV company fined for health and safety failure' date January 6 and originally appeared via HSE press release with images as 'Company fined as worker breaks leg from fall' dated 30 Dec, 2024.
--ECA
[edit] Related articles on Designing Buildings
- BS 7883.
- CDM.
- Collective restraint systems.
- CONIAC produces essential messages on safe work at height.
- Crane regulations.
- Dynamic self-retracting lanyard.
- ECA articles.
- Fall arrest system.
- Fall prevention systems.
- FASET.
- Glazier.
- Health and Safety.
- Health and safety inspector.
- Hoists.
- How to use a ladder.
- HSE land use planning pre-application advice service.
- Health and safety.
- Health and safety inspector.
- Injuries on construction sites.
- Ladder.
- Lifting Operations and Lifting Equipment Regulations (LOLER).
- Planning permission.
- Near miss.
- Notify HSE.
- Reporting accidents and injuries on construction sites.
- Risk assessment under The Regulatory Reform (Fire Safety) Order 2005.
- Roped access for conservation projects.
- Safety briefing.
- Safety in high places.
- Safety systems for working at heights.
- Scaffold register.
- Scaffolding.
- Statutory consultee.
- Sweeping building safety measures announced
- Toolbox talk.
- Types of crane.
- Urban exploration UE.
- Work at height.
- Work at height checklist for managers.
- Work at height rescue plan.
- Working at height - our duty to prevent harm and protect each other.
- Working at height training.
- Working platform.
- Workplace noise exposure estimator.
- What is CLOCS?
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).